head_banner

MIDA 241kWh 160kW, 240kW 260kWh, 261kWh 120kW Smart Mobile DC Charger with BESS Backup for Public Charging Stations

Short Description:


Product Detail

Product Tags

undefined

BESS Backup for Public Sites

Battery backup keeps DC service available when site power is limited or interrupted, so a public station stays usable during upgrades, outages or demand peaks.

undefined

Smart Mobile Deployment

Remote monitoring and over-the-air settings let operators move the unit to events, seasonal locations or a site waiting for its fixed charger to be installed.


  • Previous:
  • Next:

  • Leave Your Message:

    Write your message here and send it to us
    • Follow us:
    • facebook
    • linkedin
    • twitter
    • youtube
    • instagram

    Leave Your Message:

    Write your message here and send it to us