head_banner

MIDA 60kWh 30kW, 50kW 93kWh, 120kWh 60kW Industrial BESS EV Charging Pile for Remote Sites and Weak Grids

Short Description:


Product Detail

Product Tags

Industrial BESS EV charging pile for remote sites and weak grids

Charging on a Weak Grid

Battery storage sits in the pile, so charging continues where the grid connection is weak or intermittent, in 60kWh 30kW, 50kW 93kWh and 120kWh 60kW versions.

Battery storage charging pile for industrial yards

Remote and Industrial Sites

Suited to industrial yards, remote depots and locations where a supply upgrade is not practical.


  • Previous:
  • Next:

  • Leave Your Message:

    Write your message here and send it to us
    • Follow us:
    • facebook
    • linkedin
    • twitter
    • youtube
    • instagram

    Leave Your Message:

    Write your message here and send it to us