MIDA 241kWh 160kW, 240kW 260kWh, 261kWh 120kW Industrial BESS EV Charging Pile for Remote Sites and Weak Grids

Charging on Weak Grids
Storage decouples charging power from the supply, so a site with a small transformer still runs DC sessions without tripping protection or dropping voltage for other loads.

Remote Site Reliability
Where the grid is unreliable, the battery keeps the pile available through sags and short outages, protecting the charging schedule of a remote operation.
Leave Your Message:
Write your message here and send it to us










