head_banner

MIDA 360kW 800kW 1440kW Grid-Friendly Load Control Split-Type DC Charging Station for Mining Fleet Charging

Short Description:

Site supply is usually the real bottleneck, not the charger. This 360kW, 800kW and 1440kW split-type station meters the incoming feed and holds total draw under a configured ceiling, ramping guns down instead of tripping the mine substation when the crusher starts and four trucks plug in at the same moment.


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    MIDA 360kW 800kW 1440kW grid-friendly split-type DC charging station with incoming supply metering at a mine yard

    A Ceiling the Substation Can Live With

    Most pits have more truck than transformer. A 1440kW nameplate on a 1MVA feed is a promise the site cannot keep, and the first simultaneous session ends in a breaker trip that stops the whole yard. The station measures real draw at the point of connection and closes the loop on the rectifiers: when the ceiling is reached, guns step down in order of priority instead of switching off, and the trucks keep charging at whatever the site can carry. Diesel gensets can be included in the same loop, so a weak grid day simply lowers the cap rather than stopping work. Planners comparing control strategies read the 720kW 960kW dynamic load balancing charger, the 480kW 800kW power cabinet dispenser charger and the 360kW 720kW scalable modular split station.

    Load-controlled split DC charging cabinet holding site draw under a ceiling while mining trucks charge at reduced power

    Load Control That Follows the Shift

    A mine load is not flat. The crusher, the conveyors and the dewatering pumps all start on their own schedule, and a charger that ignores them fights for the same amps. Time-of-use profiles put the heavy charging in the shift gap when the plant is idle, while a hard cap protects the peak; between the two, the station decides which gun gets the next free kilowatt. Every change is logged with a timestamp, which is what an utility officer asks for when the connection agreement is renewed. Because the limit sits in firmware rather than in the drivers, it survives a dispenser swap. Buyers scoping a controlled site review the 1000kW 1200kW liquid-cooled split EV charger, the 600kW 720kW OCPP CCS2 fleet depot system, the energy storage charging solutions and the MIDA charging solutions index.


  • Previous:
  • Next:

  • Leave Your Message:

    Write your message here and send it to us
    • Follow us:
    • facebook
    • linkedin
    • twitter
    • youtube
    • instagram

    Leave Your Message:

    Write your message here and send it to us